Kuyumba oil and gas field

Krasnoyarsk Krai Kuyumba oil and gas field
Client
Slavneft-Krasnoyarskneftegas, LLC
About the Project

OZNA equipment has been operated in the entire oil-production process chain at the Kuyumba field during the last five years – from oil flowrate metering to pumping into the main line systems.

The specific nature of the field calls for new approaches to flowrate metering. The use of OZNA-Vx metering packages (MP) featuring the separatorless technology has become an innovative solution. Today there are 6 packages in the fleet of OZNA-Vx MPs at the Kuyumba field. Several large stations, designed and manufactured by OZNA, pump oil at the field. These include the external transportation and tank farm pumping stations, oil emulsion pumping station, first stage station, and booster pump station unit. The company supplied 3 mobile well testing and completion units (MWTCU) in 2018, one in 2019.

This year OZNA has made a contract for supply of a pipe-still heater package (PHP) complete with the hardware unit for the Central gathering station (CGS).


Kuyumba oil and gas field

Equipment

  • Multiphase Pumping Station (MPPS)
  • Front end engineering design
  • Equipment manufacturing
  • Supervision, pre-commissioning

Scope of Work

  • Front end engineering design
  • Equipment manufacturing
  • Supervision, pre-commissioning