Orenburg field
Orenburg Region

- Client
- Gazprom-Neft PJSC
- About the Project
PL-4 process line of the oil and gas processing facility (OGPF) at the Eastern area of the Orenburg oil-and-gas-condensate field. PL-4 carries out primary processing of oil and gas for transportation to the Orenburg gas processing plant. Despite challenging conditions and large H2S content in the oil, the technology developed by OZNA engineers is capable to ensure high processing quality for oil products: the chloride content in the output oil does not exceed 100 mg/l; the water cut is 0.5 % by weight max.

Equipment
- The process line consists of 9 units, including the inlet separator unit
- Gas separator unit
- Three-phase separator unit
- Oil settling unit
- Electrical dehydrator unit
- Buffer drum unit
- Main line pump unit
- Heat-exchange unit
- Heater unit
Scope of Work
- A large scale project in development and manufacturing of PL-4
- Commissioning of PL-4
Other projects in the industry
Vankor field
Krasnoyarsk Krai
This
field construction project included unique solutions: first ever in Russia all
items of infrastructure were housed in modular superblock buildings similar to
buildings of an offshore platform.
Ust-Luga marine terminal, OQMS for BPS-2
Leningrad region
Four
OQMS units with oil quality parameters metering units were commissioned within
record time
Priobskoye field
KhMAO
OZNA
designed new and prospective types of equipment suited to specific development
conditions of Priobskoye field.
Orenburg field
Orenburg Region
Process
Line No. 4 designed by OZNA engineers reduces water cut of crude to
0.5 %