Priobskoye field
KhMAO

- Client
- NK Rosneft PJSC
- About the Project
One of the largest fields in Western Siberia. For the first time: the customer specified new requirements for automation, reliability, metering accuracy, and commissioning schedule; the linear well pad facility arrangement, unique for Russia, was implemented, which provides for installation of a shifting device at each well head, while the number of wells in a pad is 20 and more.
OZNA supplied OZNA-Massomer metering packages, modular water injection stations for well pads, pumping stations, chemical dosing units and water injection distribution manifolds, oil, gas meters, and other equipment.

Equipment
- Well shifting units for oil gathering, over 1000 sets
- OZNA-Impuls metering units
- OZNA-Massomer, over 1000 sets
- Modular Water Injection Stations for Well Pads (25 pcs.)
- MWIS with horizontal pumps
- Pumping stations
- Oil gathering stations
- Chemical dosing units and water injection distribution manifolds
- Oil, gas meters
Scope of Work
- Designing new and advanced equipment models specifically for development of the Priobskoye field
- Manufacturing, supply, supervision, and pre-commissioning
- Warranty and after-sales service
Other projects in the industry
Vankor field
Krasnoyarsk Krai
This
field construction project included unique solutions: first ever in Russia all
items of infrastructure were housed in modular superblock buildings similar to
buildings of an offshore platform.
Ust-Luga marine terminal, OQMS for BPS-2
Leningrad region
Four
OQMS units with oil quality parameters metering units were commissioned within
record time
Priobskoye field
KhMAO
OZNA
designed new and prospective types of equipment suited to specific development
conditions of Priobskoye field.
Orenburg field
Orenburg Region
Process
Line No. 4 designed by OZNA engineers reduces water cut of crude to
0.5 %