Ust-Luga marine terminal, OQMS for BPS-2
Leningrad region

- Client
- Transneft PJSC
- About the Project
Russia’s largest commercial port acting as the main “window” for export of oil and petroleum products to the European market. The specific thing about the project was unprecedentedly tight construction schedule for projects of such a scale. OZNA implemented a large project in fabrication of four oil quantity and quality parameters metering systems (OQMS) with oil quality parameters metering units (QMU) for the Ust-Luga oil tank farm of the Baltic Pipeline System (BPS-2).

Equipment
- Four large OQMSs with oil quality metering units, control metering line, stationary tube-piston unit
- Means of automation and software (automation cabinets, controllers, operators workstations)
- Interconnecting equipment, pressure regulators, complete set of maintenance equipment
Scope of Work
- OQMS procurement, manufacturing, delivery
- Supervision and pre-commissioning
- Commissioning to commercial operation
Other projects in the industry
Vankor field
Krasnoyarsk Krai
This
field construction project included unique solutions: first ever in Russia all
items of infrastructure were housed in modular superblock buildings similar to
buildings of an offshore platform.
Ust-Luga marine terminal, OQMS for BPS-2
Leningrad region
Four
OQMS units with oil quality parameters metering units were commissioned within
record time
Priobskoye field
KhMAO
OZNA
designed new and prospective types of equipment suited to specific development
conditions of Priobskoye field.
Orenburg field
Orenburg Region
Process
Line No. 4 designed by OZNA engineers reduces water cut of crude to
0.5 %