Ust-Luga marine terminal, OQMS for BPS-2
Leningrad region

- Client
- Transneft PJSC
- About the Project
Russia’s largest commercial port acting as the main “window” for export of oil and petroleum products to the European market. The specific thing about the project was unprecedentedly tight construction schedule for projects of such a scale. OZNA implemented a large project in fabrication of four oil quantity and quality parameters metering systems (OQMS) with oil quality parameters metering units (QMU) for the Ust-Luga oil tank farm of the Baltic Pipeline System (BPS-2).

Scope of Work
- OQMS procurement, manufacturing, delivery
- Supervision and pre-commissioning
- Commissioning to commercial operation
Equipment
- Four large OQMSs with oil quality metering units, control metering line, stationary tube-piston unit
- Means of automation and software (automation cabinets, controllers, operators workstations)
- Interconnecting equipment, pressure regulators, complete set of maintenance equipment